About us
About us
Wind Power Plant Rakova bara
Company VE Rakov bara was founded in 2021 as an SPV, with the main task to develop, construct and operate the Wind Power Plant Rakova bara, which is planned to be constructed in the vicinity of the town of Kučevo, on Rakobarski vis, Ruđina, Marca, Mali Vrteč, Vrteč, Vukosava, Kulmea, Tilva i Đula sites. WPP Rakova bara is a continuation of the previous similar project, as very near by, WPP Krivača” is operating, and both power plants will utilize the same wind resource.
nastavak projekta izgradnje vetroelektrana u ovom delu Republike Srbije, jer se u neposrednoj blizini nalazi VE „Krivača“ i oba objekta će koristiti isti potencijal vetra.
Ownership structure of VE Rakova bara comprises of:
- Ivicom Holding GmbH, Vienna, Austria;
- Barawind d.o.o., Beograd.
Both companeis have decades-long experience in the field of renewable energy in the region and elsewhere – inclulding numerous projects in Serbia, Bosnia and Herzegovina, Croatia, Georgia and Montenegro.
Our projects
Our projects contribute the goals of energy transition of the Republic of Serbia, in the sense of attaining the net zero GHG emission, while opening up the opportunities for intensive engagement of the local enterprises during edvelopment, construction and operation. Additionally, by having new infrastructure constructed and the existing one refurbished, the access to this area shall be made easier, thus allowing local residents and tourists to access this are easier, which will be in the coming years another positive aspect of the construction of this wind power plant. što će u narednim godinama biti još jedan od pozitivnih efekata izgradnje vetroelektrane.
Company’s seat is at Jug Bogdana St. 2, 12320 Žagubica, Serbia.